Table X. Forecasts (Fs and Catches are including estimated unallocated removals)

Description\Variable Fbar16 Fbar17 Fbar18 SSB16 SSB17 SSB18 SSB % change C16 C17 C18

TAC constraint, then FMSY0.31 0.36 0.36 199173 211158 221501 5 72518 91749 97407
TAC constraint, then paragraph 5 Mgmt Plan0.31 0.33 0.33 199173 211158 228215 8 72518 84592 91848
TAC constraint, then precautionary approach0.31 0.71 0.71 199173 211158 161000 -24 72518 157658 132183
TAC constraint, then zero catch0.31 0.00 0.00 199173 211158 309384 47 72518 0 0
TAC constraint, then F20160.31 0.31 0.31 199173 211158 232171 10 72518 80442 88600
TAC constraint, TAC 20160.31 0.28 0.24 199173 211158 240108 14 72518 73037 72576
TAC constraint, then Fpa (1.4)0.31 0.36 0.36 199173 211158 221501 5 72518 91749 97407
TAC constraint, then Fpa (sigma)0.31 0.36 0.36 199173 211158 220891 5 72518 92400 97920
TAC constraint, then FMSy lower (wo AR)0.31 0.21 0.21 199173 211158 254887 21 72518 56300 66680
TAC constraint, then FMSy lower (w AR)0.31 0.21 0.21 199173 211158 254200 20 72518 57040 67408
TAC constraint, then FMSy upper (w/wo AR)0.31 0.36 0.36 199173 211158 221501 5 72518 91749 97407