Table Xb. Forecasts (split in landings and discards)

Description\Variable L16 L17 L18 D16 D17 D18 Fbar16(L) Fbar17(L) Fbar18(L)

TAC constraint, then FMSY68601 85822 91653 3917 5926 5754 0.29 0.34 0.34
TAC constraint, then paragraph 5 Mgmt Plan68601 79134 86469 3917 5459 5378 0.29 0.31 0.31
TAC constraint, then precautionary approach68601 147368 122996 3917 10289 9187 0.29 0.68 0.68
TAC constraint, then zero catch68601 0 0 3917 0 0 0.29 0.00 0.00
TAC constraint, then F201668601 75253 83397 3917 5190 5204 0.29 0.30 0.30
TAC constraint, TAC 201668601 68601 68601 3917 4436 3975 0.29 0.26 0.23
TAC constraint, then Fpa (1.4)68601 85822 91653 3917 5926 5754 0.29 0.34 0.34
TAC constraint, then Fpa (sigma)68601 86430 92104 3917 5970 5816 0.29 0.35 0.35
TAC constraint, then FMSy lower (wo AR)68601 52703 63465 3917 3597 3214 0.29 0.20 0.20
TAC constraint, then FMSy lower (w AR)68601 53396 64135 3917 3644 3273 0.29 0.20 0.20
TAC constraint, then FMSy upper (w/wo AR)68601 85822 91653 3917 5926 5754 0.29 0.34 0.34